City Center 1
Owner: Lark Group
General Contractor: Lark Group
Concrete Contractor: RBI Group
Ischebeck Products
Megashore: Tables and Flying Tables
City Center 1 is Ischebeck Can's first project. Contractors chose to use tables for the parkade, and flying tables for the typical floors above level 2. The main level and level 2 presented specific challenges dues to the fact that they were a transfer and a high lift slab. The hoarding (covered walkway) was built with Megashore which allowed building the pedestrian protection in an open concept without compromising security. A 9 metre wide parkade entrance was created by laminating three high strength Ischebeck Aluminum Beams.